ABOUT THE ROLE
The Project Scheduler will report to the MYR Group Transmission & Distribution Project Management group. The Scheduler will prepare, monitor, and update fully loaded schedules for varying size and complexity projects within an assigned region with the possibility of providing services across all MYR T&D companies as needed. The Scheduler is expected to coordinate the collection of relevant schedule data, and project progress, and work with the Project Manager to ensure that project objectives are accomplished within the prescribed time parameters. Travel will be necessary to conduct the duties of the Regional Scheduler. This position will ideally be located in the Stevens Point, WI area. Company Overview With roots dating to 1891 and 8,500+ employees, MYR Group is a publicly traded holding company of 13 specialty electrical construction companies. MYR Group and our subsidiaries work on large-scale electrical construction projects throughout the U.S. and Canada. We are contributing to a clean energy future while fostering a safe, supportive, and inclusive work environment. Our culture is built on shared values and mutual respect, where teamwork and collaboration occur naturally. Throughout our history, we have partnered with utilities, municipalities, commercial clients, and developers to deliver some of the largest and m ost notable projects including transmission/distribution/substation, commercial and industrial, storm restoration, and renewable (solar and wind farms) energy. We are consistently recognized as one of the top five specialty electrical construction firms by Engineering News Record. Essential Functions
- Support the project team by preparing, monitoring, and updating resource and cost loaded construction schedules in Primavera P6 or Microsoft Project as needed
- Produce a critical path analysis, status reporting, and assist in the development of recovery plan schedules as required
- Prepare schedule reports as required including critical path view, baseline vs actual view, look ahead views, and milestone views
- Review lower tier subcontractor schedule submittals (RFP, Baseline, Updates) and advise on any concerns
- Implement a minimum standard of use in scheduling guidelines and should be skilled in procedures to differentiate between MYR and customer schedule impacts
- Partner with both internal and external stakeholders on planning and scheduling related items including reporting requirements and progress reporting and will ensure timely completion of schedules and projects with the operational project team
- Identify opportunities and take action to build collaborative relationships within the organization while focusing on achieving business goals
- Analyze situations by gathering and organizing information, assessing cause and effect relationships, and recommending potential solutions
- The Regional Scheduler will complete the MYR Group Project Management Training Program
- Regular and predictable attendance
- Other duties as assigned
- Essential functions of this position are to be performed at a Company-designated office or field location
- Understand and comply with the Company's Code of Business Conduct and Ethics Policy and other industry-specific professional and ethical standards
ABOUT YOU
Qualifications
- Minimum 5 years of experience scheduling construction projects required (electrical industry preferred)
- Minimum 2 years of experience using Primavera P6
- Proven experience in resource loading scheduling
- Bachelor's Degree in Construction Management, Engineering, related field required; a combination of education and experience considered in lieu of degree
- Must be capable of up to 10% travel (e.g., 3 days/month), by automobile (as driver and passenger), commercial airlines, rental vehicles and public transportation and be able to lodge in public facilities. Travel will be necessary to conduct the duties of this job, and the employee must have the ability to drive and have proper licensing.
Knowledge/Skills/Abilities
- Excellent knowledge of construction and relevant industry practices and project controls
- Comprehensive knowledge and experience n resource loading scheduling
- Solid understanding of Primavera Team Member, project management software, enterprise level ERP systems, and data analysis tools
- Analytical thinking skills
- Ability to identify and seek needed information
- Proficiency in MS Office applications
WHAT WE OFFER
Compensation & Benefits
-
- Commensurate with experience, paid weekly. Posted salary ranges are made in good faith. MYR Group reserves the right to adjust ranges depending on the qualifications of the selected candidate.
- Two days per week remote work option for non-field roles depending on position and performance.
- Medical, Basic Vision, Regenexx, Teledoc, Hearing, Mental Health (Low deductibles and out-of-pocket maximums) - $15 weekly premium for employee or employee plus family coverage.
- Dental - 100% employer-paid premium.
- ThrivePass Health & Wellness Reimbursement Program - $250 quarterly, $1,000 annually for health and wellbeing-related purchases.
- Annual Paid Time Off starting at 15 days plus 10 paid Holidays (Cultural Celebration Day is a floating holiday).
- Generous 401(k) Plan with 100% match up to 6%; immediate vesting, and Annual profit-sharing potential.
- Superior educational assistance program (support for educational costs, internal training, and more!).
- Company-paid short and long-term disability, life, and accidental death & dismemberment.
- Company-paid business travel accident insurance.
- Employee Assistance Plan (EAP).
- Various voluntary plans available including supplemental vision, accident and critical illness, ID theft, group legal, group auto & home, and additional voluntary life insurance plans for employees and dependents.
Position may be subject to pre-employment screening, which may include background check and drug testing. Accessibility: If you need an accommodation as part of the employment process, contact our Employment Hotline at 1-855-635-1321. MYR Group, Inc. and our subsidiaries are proud to be Equal Opportunity Employers. We promote diversity of thought, culture, and background, which connects our family of brands. We are committed to a work environment that supports, inspires, and respects all individuals and in which personnel processes are merit-based and applied without discrimination on the basis of race, color, religion, sex, sexual orientation, gender identity, marital status, age, disability, national or ethnic origin, military service status, or other protected characteristics. We celebrate diversity and are committed to creating an inclusive environment for all employees. MYR Group does not sponsor applicants for work visas. Applicants must be currently authorized to work in the United States for any employer. MYR Group, Inc. and our subsidiaries do not work with any third-party recruiters or agencies without a valid signed agreement and partnership with the Corporate Talent Acquisition Team.
|